Iron Ore

HOPE DOWNS NORTH

HOPE DOWNS SOUTH

CLOUDBREAK

  • Iron Ore
  • Rio Tinto Iron Ore / Hancock Prospecting
  • Western Australia
  • 24 Mtpa
Prefeasibility Study, Definitive Study, EPCM for process plant.
  • Iron Ore
  • Rio Tinto Iron Ore / Hancock Prospecting
  • Western Australia
  • 8 Mtpa
Prefeasibility Study, Definitive Study, EPCM for process plant.
  • Iron Ore
  • Fortescue Metals Group Ltd
  • Western Australia
  • 45 Mtpa
Detailed design of secondary and tertiary crushing. Subsequent upgrade project to enable processing of below water table ores with high  shale content.


ROY HILL

PARKER RANGE

MARANDOO

  • Iron Ore
  • Hancock Prospecting
  • Western Australia
  • 55 Mtpa
Prefeasibility study and definitive study for process plant and associated plant infrastructure.
  • Iron Ore
  • Cazaly Resources Ltd
  • Western Australia
  • 2 - 4 Mtpa

Study to develop process plant and infrastructure from the site through to the port for a direct ship iron ore project.

  • Iron Ore
  • Rio Tinto Iron Ore
  • Western Australia
  • 16¬†Mtpa
EPCM services for a treatment plant to process below water table ores plus all site infrastructure.
Website by Trilogy